Skip to main content

Daikin Onecta

Always in control. Control your climate from any place, at any time.

Daikin Residential Controller logo

Daikin Onecta

Available for heating and air conditioning products

Simply connect your unit to your home network(cable or WLAN) and download the app to change the thermostat, set temperature schedules, review your energy consumption. Daikin Onecta is compatible with your air conditioning systems and heating systems.

NEW: voice control functionalities available with Alexa and Google home

 

*) The features available in the app can vary depending on the type of system and indoor unit you have.

Illustrating connection between Daikin units and the Daikin Residential Controller.

DAIKIN ONECTA
Heating and air conditioning

Heating and air conditioning settings on the Daikin Residential Controller

DAIKIN ONECTA
Heating and air conditioning

Control your climate

This screen provides you with an overview of your building and access to several features to control your indoor climate. You can also control up to 50 units at once for air conditioning systems. 

*) The features available in the app can vary depending on the type of system and indoor unit you have.

Voice control​

Control your system and enjoy maximum comfort, just by using your voice.​

Via Amazon Alexa or Google Assistant you can control main functions such as temperature set point, operation mode, fan speed, and much more!​
​
*) This feature is only available for the Daikin Onecta

Setting the living room temperature through Google Assistent or Amazon Alexa.

Individual rooms

Using the interactive thermostat, you can control the temperature, operation mode and schedule actions for individual rooms. 

*) The features available in the app can vary depending on the type of system and indoor unit you have.

Cooling controller on the Daikin Residential Controller

DAIKIN ONECTA
cooling

Heating controller on the Daikin Residential Controller

DAIKIN ONECTA
heating

Time schedule on the Daikin Residential Controller

DAIKIN ONECTA
heating and air conditioning

Time scheduling

Create different schedules with up to 6 actions a day for 7 days and activate specific operation modes. Time scheduling for hot water. 

*) The features available in the app can vary depending on the type of system and indoor unit you have.

Energy usage

Monitor your unit’s* energy consumption to increase your energy savings. User-friendly graphs and icons help you determine where you can save. Visit this page to explore which indoor units are compatible with this feature. 

*) The features available in the app can vary depending on the type of system and indoor unit you have.

 

*This feature is only available for some indoor units

Energy consumption overview on the Daikin Residential Controller

DAIKIN ONECTA
Heating and air conditioning

Disconnection of the Daikin Online Controller and migration to Onecta

Onecta is the latest app for controlling your Daikin system. Please note that the Daikin Online Controller app will no longer be updated. This means that we can no longer guarantee that the app will work properly, nor that the app will receive future (security) updates. The app and its supporting cloud functionality will cease to function in April 2024.

After downloading and installing the new Onecta app, simply register a new account. The Onecta app includes a quick start guide on how to reconnect your Daikin units to the Onecta app.

Download the app

More information

Do you need support?

Any question?

Do you need support?

Any question?

Do you need support?

Any question?